Apollo 7 (October 11–22, 1968) was the first crewed flight in NASA's Apollo program, and saw the resumption of human spaceflight by the agency after the fire that killed the three Apollo 1 astronauts during a launch rehearsal test on January 27, 1967. The Apollo7 crew was commanded by Walter M. Schirra, with Command Module Pilot Donn F. Eisele and Lunar Module pilot R. Walter Cunningham (so designated even though Apollo7 did not carry a Lunar Module).
The three astronauts were originally designated for the second crewed Apollo flight, and then as backups for Apollo1. After the Apollo1 fire, crewed flights were suspended while the cause of the accident was investigated and improvements made to the spacecraft and safety procedures, and uncrewed test flights made. Determined to prevent a repetition of the fire, the crew spent long periods monitoring the construction of their Apollo command and service modules (CSM). Training continued over much of the pause that followed the Apollo1 disaster.
Apollo 7 was launched on October 11, 1968, from Cape Kennedy Air Force Station, Florida, and splashed down in the Atlantic Ocean eleven days later. Extensive testing of the CSM took place, and also the first live television broadcast from an American spacecraft. Despite tension between the crew and ground controllers, the mission was a complete technical success, giving NASA the confidence to send Apollo 8 into orbit around the Moon two months later. In part because of these tensions, none of the crew flew in space again, though Schirra had already announced he would retire from NASA after the flight. Apollo7 fulfilled Apollo1's mission of testing the CSM in low Earth orbit, and was a significant step towards NASA's goal of landing astronauts on the Moon.
Background and personnel
Schirra, one of the original "Mercury Seven" astronauts, graduated from the United States Naval Academy in 1945. He flew Mercury-Atlas 8 in 1962, the fifth crewed flight of Project Mercury and the third to reach orbit, and in 1965 was the command pilot for Gemini 6A. He was a 45-year-old captain in the Navy at the time of Apollo7. Eisele graduated from the Naval Academy in 1952 with a B.S. in aeronautics. He elected to be commissioned in the Air Force, and was a 38-year-old major at the time of Apollo7. Cunningham joined the U.S. Navy in 1951, began flight training the following year, and served in a Marine flight squadron from 1953 to 1956, and was a civilian, aged 36, serving in the Marine Corps reserves with a rank of major, at the time of Apollo7. He received degrees in physics from UCLA, a B.A. in 1960 and an M.A. in 1961. Both Eisele and Cunningham were selected as part of the third group of astronauts in 1963.
Eisele was originally slotted for a position on Gus Grissom's Apollo 1 crew along with Ed White, but days prior to the official announcement on March 25, 1966, Eisele sustained a shoulder injury that would require surgery. Instead, Roger Chaffee was given the position and Eisele was reassigned to Schirra's crew.
Schirra, Eisele, and Cunningham were first named as an Apollo crew on September 29, 1966. They were to fly a second Earth orbital test of the Apollo Command Module (CM). Although delighted as a rookie to be assigned to a prime crew without having served as a backup, Cunningham was troubled by the fact that a second Earth orbital test flight, dubbed Apollo2, seemed unnecessary if Apollo1 was successful. He learned later that Director of Flight Crew Operations Deke Slayton, another of the Mercury Seven who had been grounded for medical reasons and supervised the astronauts, planned, with Schirra's support, to command the mission if he gained medical clearance. When this was not forthcoming, Schirra remained in command of the crew, and in November 1966, Apollo2 was cancelled and Schirra's crew assigned as backup to Grissom's. Thomas P. Stafford—assigned at that point as the backup commander of the second orbital test—stated that the cancellation followed Schirra and his crew submitting a list of demands to NASA management (Schirra wanted the mission to include a lunar module and a CM capable of docking with it), and that the assignment as backups left Schirra complaining that Slayton and Chief Astronaut Alan Shepard had destroyed his career.
On January 27, 1967, Grissom's crew was conducting a launch-pad test for their planned February 21 mission, when a fire broke out in the cabin, killing all three men. A complete safety review of the Apollo program followed. Soon after the fire, Slayton asked Schirra, Eisele and Cunningham to fly the first mission after the pause. Apollo 7 would use the BlockII spacecraft designed for the lunar missions, as opposed to the Block I CSM used for Apollo 1, which was intended only to be used for the early Earth-orbit missions, as it lacked the capability of docking with a lunar module. The CM and astronauts' spacesuits had been extensively redesigned, to reduce any chance of a repeat of the accident which killed the first crew. Schirra's crew would test the life support, propulsion, guidance and control systems during this "open-ended" mission (meaning it would be extended as it passed each test). The duration was limited to 11 days, reduced from the original 14-day limit for Apollo1.
The backup crew consisted of Stafford as commander, John W. Young as command module pilot, and Eugene A. Cernan as lunar module pilot. They became the prime crew of Apollo 10. Ronald E. Evans, John L. 'Jack' Swigert, and Edward G. Givens were assigned to the support crew for the mission. Givens died in a car accident on June 6, 1967, and William R. Pogue was assigned as his replacement. Evans was involved in hardware testing at Kennedy Space Center (KSC). Swigert was the launch capsule communicator (CAPCOM) and worked on the mission's operational aspects. Pogue spent time modifying procedures. The support crew also filled in when the primary and backup crews were unavailable.
CAPCOMs, the person in Mission Control responsible for communicating with the spacecraft (then always an astronaut) were Evans, Pogue, Stafford, Swigert, Young and Cernan. Flight directors were Glynn Lunney, Gene Kranz and Gerry Griffin.
Preparation
According to Cunningham, Schirra originally had limited interest in making a third spaceflight, beginning to focus on his post-NASA career. Flying the first mission after the fire changed things: "Wally Schirra was being pictured as the man chosen to rescue the manned space program. And that was a task worthy of Wally's interest." Eisele noted, "coming on the heels of the fire, we knew the fate and future of the entire manned space program—not to mention our own skins—was riding on the success or failure of Apollo7."
Given the circumstances of the fire, the crew initially had little confidence in the staff at North American Aviation's plant at Downey, California, who built the Apollo command modules, and they were determined to follow their craft every step of the way through construction and testing. This interfered with training, but the simulators of the CM were not yet ready, and they knew it would be a long time until they launched. They spent long periods at Downey. Simulators were constructed at Houston's Manned Spacecraft Center and at KSC in Florida. Once these were available for use, the crew had difficulty finding enough time to do everything, even with the help of the backup and support crews; the crew often worked 12 or 14 hours per day. After the CM was completed and shipped to KSC, the focus of the crew's training shifted to Florida, though they went to Houston for planning and technical meetings. Rather than return to their Houston homes for the weekend, they often had to remain at KSC in order to participate in training or spacecraft testing. According to former astronaut Tom Jones in a 2018 article, Schirra, "with indisputable evidence of the risks his crew would be taking, now had immense leverage with management at NASA and North American, and he used it. In conference rooms or on the spacecraft assembly line, Schirra got his way."
The Apollo 7 crew spent five hours in training for every hour they could expect to remain aboard if the mission went its full eleven days. In addition, they attended technical briefings and pilots' meetings, and studied on their own. They undertook launch pad evacuation training, water egress training to exit the vehicle after splashdown, and learned to use firefighting equipment. They trained on the Apollo Guidance Computer at MIT. Each crew member spent 160 hours in CM simulations, in some of which Mission Control in Houston participated live. The "plugs out" test—the test that had killed the Apollo1 crew—was conducted with the prime crew in the spacecraft, but with the hatch open. One reason the Apollo1 crew had died was because it was impossible to open the inward-opening hatch before the fire raced through the cabin; this was changed for Apollo7.
Command modules similar to that used on Apollo7 were subjected to tests in the run-up to the mission. A three-astronaut crew (Joseph P. Kerwin, Vance D. Brand and Joe H. Engle) was inside a CM that was placed in a vacuum chamber at the Manned Spaceflight Center in Houston for eight days in June 1968 to test spacecraft systems. Another crew (James Lovell, Stuart Roosa and Charles M. Duke) spent 48 hours at sea aboard a CM lowered into the Gulf of Mexico from a naval vessel in April 1968, to test how systems would respond to seawater. Further tests were conducted the following month in a tank at Houston. Fires were set aboard a boilerplate CM using various atmospheric compositions and pressures. The results led to the decision to use 60 percent oxygen and 40 percent nitrogen within the CM at launch, which would be replaced with a lower pressure of pure oxygen within four hours, as providing adequate fire protection. Other boilerplate spacecraft were subjected to drops to test parachutes, and to simulate the likely damage if a CM came down on land. All results were satisfactory.
During the run-up to the mission, the Soviets sent uncrewed probes Zond 4 and Zond 5 (Zond 5 carried two tortoises) around the Moon, seeming to foreshadow a circumlunar crewed mission. NASA's Lunar Module (LM) was suffering delays, and Apollo Program Spacecraft Manager George Low proposed that if Apollo7 was a success, that Apollo 8 go to lunar orbit without a LM. The acceptance of Low's proposal raised the stakes for Apollo7. According to Stafford, Schirra "clearly felt the full weight of the program riding on a successful mission and as a result became more openly critical and more sarcastic."
Throughout the Mercury and Gemini programs, McDonnell Aircraft engineer Guenter Wendt led the spacecraft launch pad teams, with ultimate responsibility for condition of the spacecraft at launch. He earned the astronauts' respect and admiration, including Schirra's. However, the spacecraft contractor had changed from McDonnell (Mercury and Gemini) to North American (Apollo), so Wendt was not the pad leader for Apollo1.Farmer & Hamblin 1970, pp. 51–54 So adamant was Schirra in his desire to have Wendt back as pad leader for his Apollo flight, that he got his boss Slayton to persuade North American management to hire Wendt away from McDonnell, and Schirra personally lobbied North American's launch operations manager to change Wendt's shift from midnight to day so he could be pad leader for Apollo7. Wendt remained as pad leader for the entire Apollo program. When he departed the spacecraft area as the pad was evacuated prior to launch, after Cunningham said, "I think Guenter's going", Eisele responded "Yes, I think Guenter went."
Hardware
Spacecraft